Our Projects
- 1994 – Shagaya “A”, UM AL HEEMAN “B” and UM AL HEEMAN “C”, 132/11 kV S/S, ANSALDO Co. with ABB.
- 1999 – UM AL HEEMAN “A”, 132/11 kV S/S, CONTRACTORS Co.
- 2001 – Quortba “B” and Salwa “C”, 132/11 kV S/S ANSALDO Co.
- 2002 – Electrical Work with Mohamed AbulRahman AlBahar for US Army in Naval Base.
- 2002 – MINA ABDULLAH “E” and SABHAN “C”,132/11 kV S/S Ansaldo Co.
- 2007 – Supply and Erection of WALL SEALING PLATES for OL2KW 300 kV S/S.
- 2008 – Fabrications and Installation of platform and steps for OL2KW , 300 kV S/S.
- 2009 – For AL-AHLEIA SWITCHGEAR Co. Erection for JABER AL AHMED “B”132/11 kV Sub Station.
- 2010– Steel-Bar Earthing, and Out Door Earthing for 400 kV Substations. For ABB, Sulabiya – Z. Jaberiya – Z, Fintas – Z.
- 2011 – Erection for 132/11 kV Substation for Al-Ahleia, Saad Abdullah-G and Saad Abdullah-I.
- 2011 – Electrical installation of MV (6.6kV) switchgear Panels for KNPC, KUWAIT.
- 2011 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation Salmiya “J” and SHPT “A”.
- 2012 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation JEWN “A”.
- 2012 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation SAASC “I”.
- 2013 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation MESSILA (‘E – F – G’)
- 2013 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation SABAH AL-AHMED (‘1F’,’ 1C’) .
- 2014 – For L&T Construction Power Transmission & Distribution. 132/11 kV Substation Erection for (ARAI ‘E’- JWAN ‘B’- ABFT’A’).
- 2015 – For L&T Construction Power Transmission & Distribution. 132/11 kV Substation Erection for (AMIRI ‘A’- JBAH ‘1X’ and JBAH – ‘5X’).
- 2015 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation (SBSM ‘G’).
- 2016 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation (MRGB ‘D’).
- 2017 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation (SBHIN ‘D’).
- 2017 – For IMCO Engineering & Construction Co WLL. Erection for 132/11 kV Substation (SABRIYA “C”) North Kuwait inside KOC Area.
- 2017 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation (SBHIN ‘E’ &SHPT ‘G’) Sub Station. And Installation Work on RING MAIN 11/0.433 kV Distribution S/S.COI/14/0067.
- 2018 – For AL-AHLEIA SWITCHGEAR Co. Erection for 132/11 kV Substation (AIRPORT `C` & DOHA” B”) And Replacement of 11kV DBB SWGR. Mina Al Zour Pumping Substation).
- 2018 – For Industrial Electrical Projets Co. (IEPC) Extension works 132/11kV AL RAI ‘D’ Substation in (Avenues).
- 2018 – For AL-AHLEIA SWITCHGEAR Co. (Erection work for 132/11 kV Substation, RASS ‘E’, SHKH ‘D’, WABM ‘1B’, DOHA ‘B’, AIRPORT ‘C’.
- 2019 – For AL-AHLEIA SWITCHGEAR Co. (Erection work for 132/11 kV Substation, HAWL ‘J’ & JABR ‘F’) and 400/132/11 kV WABM ‘1Z’ Substation.
- 2020 – For AL-AHLEIA SWITCHGEAR Co. (Erection work for 132/11 kV Substation, Erection work for 132/11 kV Substation, MRGB ‘C’ & ‘F
- 2020 – For Larsen & Toubro Ltd. Erection for work for MUTLA 3A, 2I, 3B, 4H, 2H, and SABM ‘A’ 132/11 kV South Abdulla Mubarak City.
- 2021 – For Larsen & Toubro Ltd UEA. Erection for 33/11 kV (Project no. 12838 – AL MERYAL, AL BATEEN, MADEEF &WBS) 4 Primary Substation Al Ain City, UAE.
- 2022 – For National Contracting Co. W. L. L Erection for work for MUTLA ‘1A’ 132/11 kV Substation.
- 2023 – We are currently working for AL-AHLEIA SWITCHGEAR Co. Erection for work for LA’ALA KHRN ‘D3A’ & SASC ‘D3B’ 132/11 kV Substation.
- 2023 – We are working currently for AL-AHLEIA SWITCHGEAR Co. Erection for work for LA’ALA KHRN “2Z“400/132/11 kV Substation
- 2023 – We are currently working for AL-AHLEIA SWITCHGEAR Co. Installation, Testing & Pre-commissioning of Ring main Substation Including Transformer Panel and a Feeder Panel, 4 & 2 Transformer Substation.
Project Insights
132 kV GIS Substation erection
For AL-AHLEIA SWITCHGEAR Co. Erection for JABER AL AHMED “B” 132/11 kV Sub Station. Our team was entrusted with the design, engineering, procurement, construction, and commissioning of the entire 132 kV GIS substation.
Cable laying, tray & support
Our team was responsible for the meticulous planning, procurement, and installation of cables within the cable tray system in the substation.
SWITCHGEAR 11KV & SWITCHGEAR 132KV
We are pleased to inform you about our expertise in switchgear installations for both 11 kV and 132 kV systems. Our company has successfully completed numerous projects in the field of switchgear, demonstrating our proficiency and commitment to delivering reliable and efficient electrical solutions.